This year at the beginning of the year/month, I hung a dry erase board near the entry to my sewing room. I wrote the immediate list of projects I wanted to accomplish first.
And as I finished writing I thought that maybe I could finish all this list in January.
Here I am at the end of January so I thought I’d post an update.
- Two items on the list are completely finished: the Bargello and K’s tshirt quilt.
- The President’s quilt is ALL pieced. Tonight I made the label so I’ll put that on in the morning and load it onto my quilting frame.
- I worked on the SL quilt on Saturday. All the blocks are done now and just need assembled. I planned an interesting and challenging layout so that won’t happen very fast.
However, I’m pleased with what I’ve finished so far. And I hadn’t planned to stumble on the basement steps either. I’m feeling much better this week!
And my thanks to you for reading along… here is a peak at the president’s quilt top…. finished tonight… ready to quilt tomorrow!! WooHoo!!!
LOVELY!!!! The sashing really pops. I love it.
I am so amazed by your ambition! It would take me a year just to get motivated to do ONE of those projects!
LOVE IT!!!! The fabrics you picked for the sashing/border really make the blocks pop and it just looks so lovely!!! I would never have picked dots and large floral but it works so well together!! Can’t wait to see the rest finished up 😉
Pretty sashing – love the dotty fabric.